They will end the operation on Friday, wherever they are w/ material. The ramp basin is mostly done, but they probably won't get the eastern part of it. There's three to four feet all through there, though. The settle basin is way full, as they have put fifty percent more material in it than they anticipated to. The oepration is shutting down often to allow the water to drain off.
Paul