
 |
pdspeh69's Fishing Blog
|
|
|
» 22 October 2012 |
blogs.noreast.com/pdspeh69 |
DNF-- Garage doors prt 3 -- 5 yr Wed ANNIV.~ 10-20-12
Beautiful Sat - 70 nice out - great weather to work outside.
very similar to our wedding day 5 yrs ago
worked hard all day Sat & Sun
Sat 10-20-12
- bolstered the doors girth.
- deinstalled all
- Cut & fit 1x3s for back of doors - huge improvement
- painted 1 set
Rushed to pt eveything away - doors back up..
went to Ole Grill around the corner for anniv dinner - home for scary movies & Wine.
Sun 10-21-12
took doors back down.. late start by 11pm...
- All cane bolts in ( 4.5 amp Ryobi needs replacement)
- painted 2nd set.
- Exterior seams installed - 1/2 painted..
Ms Ginny mom dies. 87 - went to the wake late : 8pm- 915
saw all of the old neighbors there..not a fun reunion but still good to see all of them in one place.
pd
This post edited by pdspeh69 10:24 AM 10/24/2012





posted by pdspeh69 at 12:18 PM | 0 comments
|
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - |
» 15 October 2012 |
DNF--garage doors prt 3 -- Old door out - new door IN ! ~ 10-6-12
9-12th:
- cut out and fit 1 window per night after work..3hrs per.
Sat. 10-13-12
- painted window trim , inside window and installed all parts
- Cleaned up garage ( drill press table area) and all items around the garage opening. that area was a mess..took 1/2 the day just for that..more trash to go out..threw away the neaon miller sign- broken..
Sunday 10-14-12
- Jill left for upstate work conference ( 3 days)
- Rain forcast for next weekend.. so I went all in to get the doors installed! _Yeah !
-all in with locks on by sunset
New Garage door install
- 12 hinges
- 2 outside locks & hinged hardware
- 4 top slide bolt locks
- frame out interior & painted
- doubled header
- fix out termite damage (took 1 hr just Chiseled out)
- 4 door sweeps
-remove nails& reinstall old trim
- cut vertical seam parts
pd
This post edited by pdspeh69 05:56 PM 10/15/2012





posted by pdspeh69 at 09:52 AM | 0 comments
|
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - |
» 12 October 2012 |
SB - CN - FP ~ Columbus Day off ~ 34" Bass + blow up ~ 10-8-12
to the water by 6:30
sunrise 6:56
crisp 44 degree morning.
-----------------------------------
WIND NNW 10-15+
WATER 65
Air 44-60
High @ 542 am
-----------------------------------
Wind against tide made for tough conditions..not a tap for hrs.
Spot after spot -- nada - started feeling like one of those day where putting back on the trailer might be a good idea...but since I had not been out for almost a month i was just going to keep on it for aleast one more spot until the out going tide gives out...last spot.. 1st cast..22" BASS.. nice.
had a big fish Nail my lure in 6ft of water...ZZZZZZZZZZZZ wow- nearly spooled my 3000. Had to drive the boat towards him in order to gain some line back..
------------------------------------
Total:
1 keeper Bass (34") Football - fat head.
1 Short Bass ( 22")
4 Scup ( 10-15")
1 Blues bite off
a few missed hits
All Action @ FP...no where else.
--------------------------------------
pd
This post edited by pdspeh69 01:41 PM 10/17/2012
posted by pdspeh69 at 09:00 AM | 0 comments
|
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - |
» 07 October 2012 |
DNF--garage doors prt 2 -- 0IL changes. ~ 10-6-12
6th-8th:
- painted All 4 doors - 2 per day - sat n sun
- did both oil changes sat:
~ WJ ( 50K)
~ CRV ( 16K)
- bought closet doors ( and returned them- need 77" - got 79")
- + $30 ( 7 )1x3s for frame out.
- window shelf in basement for charging drills
- cut center weddges & spray painted black
- removed A/c units
- Worked a little on basement bins w/ J - she cleared the space under the kitchen -- looks like when we moved in before the crap took over..
update:--------------------------------------------------------------
- from the 9th-12th - each night after work - I went into the basement and cut out a window section ( one a night)
Reg Gas @ $4.09
This post edited by pdspeh69 09:08 AM 10/12/2012



posted by pdspeh69 at 02:26 PM | 0 comments
|
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - |
» 01 October 2012 |
DNF - Weekend ~ FALL DOOR project begins ~ 9-30-12
Since Jill cleared the garage - I decided it was time to get going on the Garage doors...which means DNF again -- only 2 days fished in Sept..yikes.  
Over cast and cool both days too..except for a 30 min heavy downpour and sqaull on Sunday..( only way the boats getting wet..)
Jets Suck..got destroyed by SF 34-0...which made it easier to get all the door frames Complete. by 7pm sunday..
Sat- cleaned the garage 1/2 the day and got started - 1 doors
Sun- 3 Doors = 8hrs.
should be pretty nice when completed...2 months from now?
pd


posted by pdspeh69 at 09:24 AM | 0 comments
|
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - |
Subscribe to this blog |
|
About Me
FISH
 View my User Profile
 - - - - - - - - - - - - - - - - - - - - -
Links
 - - - - - - - - - - - - - - - - - - - - -
Recent Blog Posts
 - - - - - - - - - - - - - - - - - - - - -
Archives
|
|